Spec. 1-16  Location of non-oil filled electrical equipment

Spec. 1-17  Location of oil filled pad-mounted equipment (1 of 2)

Spec. 1-17  Location of oil filled pad-mounted equipment (2 of 2)

Spec. 1-19  General clearance for pad-mounted switchgear

Spec. 1-20  Installation procedure for protective bollards used with pad-mounted equipment

Spec. 1-23  Clearance required for non-enclosed swimming pools, fountains and similar installations (1 of 2)

Spec. 1-23  Clearance required for non-enclosed swimming pools, fountains and similar installations (2 of 2)

Spec. 1-43  Trenching for underground cables

Spec. 1-44  URD layouts

Spec. 1-45  Subdivision staking requirements for all Tampa Electric equipment in easements (1 of 2)

Spec. 1-45  Subdivision staking requirements for all Tampa Electric equipment in easements (2 of 2)

Spec. 1-46  Staking requirements for apartments and zero lot line applications

Spec. 1-47  Site preparation, three-phase pad-mount transformer installation

Spec. 1-48  Site preparation, single-phase pad-mount transformer installation

Spec. 6-1  Poured in place concrete pullbox and handhole design

Spec. 6-2  "S" Type precast manhole 8' X 12' X 7' (1 of 2)

Spec. 6-2  "S" Type precast manhole 8' X 12' X 7' (2 of 2)

Spec. 6-3  Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox (1 of 2)

Spec. 6-3  Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox and accessories (2 of 2)

Spec. 6-4  Precast 6' X 12' X 7' concrete pullbox/splicebox (1 of 2)

Spec. 6-4  Precast 6' X 12' X 7' concrete pullbox/splicebox and accessories (2 of 2)

Spec. 6-5  Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox (1 of 2)

Spec. 6-5  Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox and accessories (2 of 2)

Spec. 6-7  Polymer concrete pullbox 30" X 60" X 48"

Spec. 6-8  Precast 10' - 0" X 8' - 6" X 7'- 0" T-type manhole

Spec. 6-9  Precast manhole 10' X 10' X 7' (1 of 2)

Spec. 6-9  Precast manhole 10' X 10' X 7' (2 of 2)

Spec. 6-11  Pad design for single-phase pad-mounted transformers

Spec. 6-12  Pad design for three-phase pad-mounted transformers

Spec. 6-18  Conduit/pad details - 600 AMP - P.S.E. multi-compartment gang-operated, live-front

Spec. 6-20  Pad detail for pad-mounted secondary termination cabinet

Spec. 6-21  Splicebox/light traffic handhole 30" X 48" X 18"

Spec. 7-16  Conduit detail for three-phase pad-mounted transformer

Spec. 7-26  Requirements for single-phase URD pad-mounted transformer installations

Spec. 7-56  Installation procedure for protective bollards used with pad-mounted equipment

Spec. 11-2  Secondary connectors single-phase URD pad-mount transformer

Spec. 12-26  Pad-mounted secondary cabinet (1 of 3)

Spec. 12-26  Pad-mounted secondary cabinet (2 of 3)

Spec. 12-26  Pad-mounted secondary cabinet (3 of 3)

Spec. 13-17  Minimum space requirements for flammable liquid filled pad-mounted transformer in indoor vault

Spec. 13-21  Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (1 of 2)

Spec. 13-21  Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (2 of 2)

Spec. 13-23  Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (1 of 3)

Spec. 13-23  Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (2 of 3)

Spec. 13-23  Typical frame & cover details 600 AMP manual and auto-throwover pit area (3 of 3)

Spec. 13-25  Typical space and installation requirements for metering cabinets

Spec. 13-27  Vault space requirements for metal enclosed switchgear

Spec. 13-29  Typical conduit details pad-mount transformer in indoor vault

Call before you dig

Every digging project, no matter how large or small, requires a call to 811. View the color code for marking underground utility lines.

Call before you dig block

Questions about your construction project?

Call Tampa Electric's Construction Team at 813-635-1500.

Pay Construction Costs

Payment can be made online or by check or money order to:
Please submit to:
Tampa Electric
c/o ED Billing
PO Box 173169
Tampa, FL 33672

Chat
" class="hidden">极迅互联加速器